Basic Assignments
 
Options & Settings
 
Main Time Information
Color Code: Yellow
Assigned To: Brandon Moore
Created By: Brandon Moore
Created Date/Time: 11/16/2017 5:55 pm
 
Action Status: Blank (new)
Show On The Web: Yes - (public)
Priority: 0
 
Time Id: 3228
Template/Type: Brandon Time
Title/Caption: Working with Bryan
Start Date/Time: 11/16/2017 3:30 pm
End Date/Time: 11/16/2017 5:00 pm
Main Status: Active

Sorry, no photos available for this element of time.


Notes:
On a GoToMeeting session with Bryan. He is working on a custom project to help show and manage plants. He is a nut and peach tree farmer, so this project is perfect for him. Anyways, we got out a blank file and started to write down what we needed to do (a basic scenario or use case). Once we had a good plan, we went into the system and set up the pieces that we needed. We did everything manually and I tried to help him see the processes and what id number (technical stuff) the system generated behind the scenes.

Once we had the manual process down... I spent some time pitching an idea to Bryan how we could combine vendors, PO's, PO line items, parts or items, locations, elements of time, subs of time, and flex grid all together from one page. Basically a custom wire job or custom interface. I pitched a page that asked for 10 pieces of info from one page. Then when that page gets submitted, we could build a certain number of PO's with one plant or item per PO, we could build one elements of time per PO (per plant), and then crisscross everything together including notes, dates, times, phases, locations, and subs phases of time. It would be pretty cool

The goal of the meeting was to show Bryan some of the existing tools in the shed. The second goal was to expand the vision of how we could harness some of that into a custom solution of sorts. Lots of moving pieces and it takes quite a bit to think it up and then to plan it out. I think that kind of stuff is fun... :)